# ISO 42102 stage history and dates

Home / Timeline

# The stage history and what comes next

The draft was issued for public enquiry in June 2026, the ballot closed on 7 August 2026, and ISO records stage 40.60, close of voting, effective 8 September 2026. The next recorded steps are the full report, the approval stage, publication and national adoption. ISO has published no date for any of them.

Stages as recorded, read on 22 October 2026
StageDateWhat it means
30.00No date statedCommittee draft registered. No date is stated in the public record read here.
40.00No date statedDraft International Standard registered for enquiry. No date is stated in the public record read here.
40.2015 June 2026DIS ballot opened. The Irish national body records the review as published on 15 June 2026.
40.608 September 2026Close of voting. The Serbian national body records this as the effective date.
40.99No date statedFull report circulated. Ahead, and not dated in the public record.
50.00No date statedFinal text received or FDIS registered for formal approval. Ahead, and not dated.
60.00No date statedUnder publication. Ahead, and not dated.
60.60No date statedPublished. Ahead, and not dated.
estimate16 September 2027Planning estimate used on this site. Not an ISO date.

## What the history shows

The national body notices put the enquiry window at 15 June to 7 August 2026, and the Serbian project page records close of voting on 8 September 2026. The DIN draft record gives a date of issue of 12 June 2026 and describes 41 English pages, or 105 pages in the German and English edition. Those are consistent facts about the same draft, read from different national publishers.

## What to diarise

- The full report. The comments from the enquiry are resolved and the text moves toward approval.

- Approval. The final text is registered for formal approval. No date is published.

- Publication. The standard becomes available, usually at stage 60.60.

- National adoption. National bodies publish their editions, often with a transition window.

The watch checks the ISO record and the public preview for these transitions and emails the diff. The planning date on this site is recalculated only when the public record changes, not when a stage slips in conversation.

## Why the estimate is labelled

A planning date that looks like an ISO date becomes a deadline nobody agreed. We label ours an estimate on every page and explain its basis, so a reader can replace it with their own planning assumption without having to unpick our claim.

Source. National body project page, stage 40.60, read on 22 October 2026. The effective date of 8 September 2026 is read here.
Claim level: public preview and public project record. No draft text is reproduced.

Last updated: 2026-10-22

Source: https://iso-42102-revision-checker.theartofservice.com/timeline/
